A humanoid robot has been handling sheet metal loading on BMW's production line for 11 consecutive months. What is worth examining is how hard metrics like "5 mm tolerance, 2-second placement" are reliably achieved.
Performs pick-and-place tasks on an active assembly line, picking parts and placing them into welding fixtures
Must complete placement within 2 seconds and within 5 mm tolerance, with a per-shift target of 99% placement accuracy
Over 11 months, loaded 90,000+ parts, ran 1,250+ hours, and contributed to the production of 30,000+ X3 vehicles
Organization: BMW Group (Plant Spartanburg) · Third-party verified
Figures are third-party verified, not measured by this site.
Source: https://www.figure.ai/news/production-at-bmw