Solution #0709 · Energy & Utilities · Industry-specific

AI Agent for Smart Combustion in CHP Boilers

For plants where staff tune the air-coal ratio by hand: understand this approach before deciding

Score
8
Internal scoring scale
Roles
Operations
Frontline role
Industry
Energy & Utilities
Industry-specific
Maturity
Case-verified
Verified case
01 — Business fit

Who should use it, and when

A good fit for enterprises with captive coal boilers or district combined heat and power, especially plants where boiler efficiency hovers around 89% and operators respond to load swings by manually adjusting coal feed and the air-coal ratio. The source lists the industry as Energy & Utilities, involving frontline boiler operators and operations management staff.

02 — Key steps

The key moves that make it work

1
Check the data is complete first

You need continuous coal feed, air flow, steam temperature/pressure and heat load data. The source's sequence is a Phase I data foundation first, then the agent; plants with unstable measurement points or missing history should complete acquisition before discussing parameter optimization.

2
AI only optimizes parameters

The agent computes optimization commands and operating recommendations for key parameters such as coal feed and air-coal ratio in real time; it does not replace existing control and protection logic. Combustion safety bounds remain enforced by the original system, and AI output stays within the executable range.

3
People keep final control authority

Operators shift from constant manual adjustment to confirming or adopting AI recommendations; they can switch back to manual on abnormal conditions. Before go-live, write down when humans take over and who confirms, and add it to shift handovers.

4
Try it in simulation before deployment

The source ships an OTS simulator: trial new parameter combinations in simulation, observe results, then deploy. The plant-level intelligent platform aggregates data and issues commands so the agent connects to one unified data source rather than point solutions.

5
Compute returns from energy and labor

Convert returns using actual coal prices, annual running hours and headcount in the affected roles, and fix a baseline period first — say the full heating season before retrofit. Without a common baseline, savings claims collapse after the fact.

TAKEAWAY
Fill the data gaps before discussing optimization
Copy the sequence: stabilize combustion data first, then let AI advise at the parameter level with humans keeping takeover rights. As for the headline numbers — those are Phase I figures and don't guarantee your project reaches them.
03 — Risks & pitfalls

What to know before you start

Risk 1 · A coal change breaks itThe source says nothing about coal type or quality swings. If the calorific value or ash content of delivered coal varies widely, recommendations outside the training range can lower efficiency instead — confirm coal supply stability first.
Risk 2 · Claiming Phase I numbers as your own88.7% to 90.2% is the Phase I overall result, which also includes AI combustion optimization plus other measures — not the agent's standalone contribution. Building your business case on it overstates returns.
Risk 3 · Inaccurate measurement points hide resultsIf coal feed or air-flow sensors drift or go uncalibrated, optimization commands are built on wrong data. Calibrate points and run a material-balance check before go-live, or the optimization direction itself may be wrong.
04 — Results & evidence

What the results look like

Case: Hefei Thermal Power Group (2026) · publicly reported

Measured impactBoiler efficiency rose from 88.7% to 90.2%, saving about RMB 3.5M in coal costs and about RMB 1.2M in labor costs per year, with business system efficiency up 75% (publicly reported, 2026-02, Phase I results)

These are Phase I overall results; public coverage does not disclose the agent's standalone share, so they cannot be cited as single-measure data.

Source: http://ah.people.com.cn/n2/2026/0203/c227767-41491593.html