Solution #0752 · Logistics & Transport · Industry-specific

Yangshan Port Phase IV fully automated terminal

How a fully automated terminal splits the work: people move to the control room, the system sequences the jobs

Score
8
Internal scoring scale
Roles
Production
Frontline role
Industry
Logistics & Transport
Industry-specific
Maturity
Case-verified
Validated case
01 — Business fit

Who should use it, and when

Built for heavy-asset sites weighing a move to fewer people on the ground: ports and wharves, container yards, and large warehouses where equipment spending is high, work processes are fairly fixed, and manual driving and on-site dispatching still take a large share. The source lists the industry as Logistics & Transport and the main party as a port operator. If your cargo mix is broad and arrivals swing widely, pilot one zone before deciding.

02 — Key steps

The key moves that make it work

1
Move people off the site into the control room

The site switches to unmanned operations and quay cranes are driven remotely from the control room. The precondition is standardizing the operating moves and making video and sensor feeds reliable; otherwise remote operation is actually slower. The source does not say how many people one machine needs.

2
One system schedules every machine

Quay cranes, automated guided vehicles, and rail-mounted gantry cranes no longer each manage their own segment; a single scheduling system sets the sequence. Before go-live, unify device interfaces and data definitions, or the system cannot see real-time status and the schedule cannot be executed.

3
The algorithms sequence the work

Be clear about where big data and smart algorithms are used: job-sequence optimization and equipment dispatching, not replacing people's judgment on equipment faults. Tuning needs a certain volume of historical job data; when data is thin, run fixed-rule scheduling first.

4
Iterate year by year after go-live

The terminal opened in December 2017 and overall operating efficiency has risen every year since, which shows the system was not fixed at first go-live. Write a post-launch tuning period and acceptance metrics into the contract, and check results quarterly.

5
Count the jobs before you change the equipment

The cuts fall mainly on on-site driving and dispatching roles, while remote operation, equipment maintenance, and system operations roles grow. List the headcount added and removed role by role before the retrofit, then judge whether total labor really falls.

TAKEAWAY
What transfers is the division of work and the scheduling model
What is worth borrowing is the combination — unmanned site, remote control, unified scheduling — not any single machine. Before you start, confirm your operations are standardized enough, then decide the scope.
03 — Risks & pitfalls

What to know before you start

Risk 1 · New equipment, same old processAutomated equipment inherits the old manual dispatching habits, vehicle waiting and empty runs do not fall, and the investment is hard to recover. The test is blunt: after the retrofit, did shouting across the yard and paper handover sheets actually disappear?
Risk 2 · Back-office roles left out of the countThe source's headcount reduction is a total figure compared with a conventional terminal of the same scale. Count only on-site roles and you will underestimate the new control-room, maintenance, and system-operations staff; do the labor math on a full-scope basis.
Risk 3 · No plan for exceptionsWith nobody on site, equipment faults, network outages, and cargo exceptions all have to be spotted and handled from the control room. Without a tiered response process and on-site standby arrangements, one network cut can stop the whole working face.
04 — Results & evidence

What the results look like

Case:Shanghai International Port (Group) Co., Ltd. (SIPG) — Yangshan Phase IV terminal(2017) · Institutional report

Measured impactHeadcount about 70% lower than a conventional terminal of the same scale, labor productivity at 213% of a conventional terminal, and overall operating efficiency up about 30% from opening (basis: operator's website / Shanghai SASAC, 2023)

The basis is the operator's website and a 2023 release by the Shanghai SASAC; it is a whole-terminal comparison against a conventional terminal of the same scale, not per-step data.

Source: https://www.portshanghai.com.cn/yszt/2002.jhtml