Help procurement merge two codes for the same cylinder into one and cut duplicate orders
The source marks the role as procurement and leaves the industry unmarked. It suits teams where the same physical item carries several codes in the material master and buyers tell them apart by memory or chat logs; typical signs are one cylinder with two names, duplicate orders, stock split across warehouses, and stock counts that do not reconcile. This is a live, general solution that procurement and material-management staff with the same duplicate-code problem can adapt.
Pick one or two high-volume, messily named material categories (cylinders, say) to start, and export that category’s codes, names, specifications, and supplier fields into a sheet. Do not clean the whole database at once — a wrong change is hard to roll back.
Write down which fields must match to count as the same part: model and specification, key dimensions, material, and supplier part number. Put the criteria on paper and have procurement and the user side confirm them before editing, so the standard does not change mid-cleanup.
As you merge, maintain an old-to-new code crosswalk so the old codes in historical orders, drawings, and supplier systems still resolve to the physical item; otherwise old documents lose their link.
After merging, tell suppliers to bill against the new code; otherwise the next delivery is entered under the old code and duplicates reappear quickly. You can ask that delivery notes show both old and new codes for a period.
Once the merge is done, physically count a few storage locations and judge success by whether quantities reconcile and orders are no longer duplicated. Send any code that does not reconcile back for re-checking — do not assume the cleanup is finished.