Operations no longer combs through a 37-page document to check who skipped what — one weekly execution-tracking report covers it
For Operations teams that keep their SOP in a Feishu doc but cannot confirm what actually got done; the source lists the role as Operations and marks no industry. It solves the problem that 'nobody knows who did and who skipped what': execution traces for each SOP item are collected in a fixed place and summarized weekly, so skipped items can be called out. The precondition is a team willing to spend a little extra time leaving traces.
Split the 37-page SOP into items that can each be judged done or not done, with the owner and the expected deliverable written on each; anything that can't be split stays out of the report.
Assign each SOP item a single designated location — a link, a screenshot or a log sheet; things scattered across group chats and direct messages don't count, or the weekly report can't aggregate them.
State clearly that an item counts as executed only when the deliverable is visible in its designated place; verbal claims of having done it don't count. Write the criterion into the SOP's first page to end the weekly arguments.
Name one person to export the report at a fixed weekly time, list unfinished items separately and return them to their owners, and post the report to a fixed group with no second-round editing.
Run one small group first for two weeks and see how long it takes executors to backfill traces; roll out only if the cost is acceptable, and if it doesn't work, fix the checklist items rather than adding people to watch over them.