Saves the production daily report from manual history digging — abnormal bins get named to a process step the same day
Built for engineers and line supervisors in Production who own the CP/FT test daily report, and for Manufacturing settings with many product models and scattered test steps. The problem it solves: the report only gives today's numbers, nobody looks back three weeks at your own baseline, and abnormal bins usually surface after the fact. Prerequisite: test data must be kept per lot so historical distributions can be recomputed.
State that the baseline is the bin distribution from three weeks ago for the same product, process step, and test station — not the line-wide average or yesterday's numbers. Print the definition in the report header so everyone reads the data through the same algorithm.
Beyond the daily report, keep each lot's per-bin counts and test times; summary yield alone cannot rebuild a baseline. Retention must at least cover the baseline window — delete the old lots and the comparison chain breaks.
Write 'abnormal' as decidable conditions — for example, a bin's share deviating from baseline beyond a set margin, or two consecutive lots drifting the same way. Process and test engineers set the thresholds together, loose first and tightening later, so the screen is not full of alarms on day one.
The report itself names the abnormal bin, the process step or machine, and the owner confirmed that day — no chasing in group chats. Fill in whoever is actually on shift, not just the department name, or nobody claims it.
After a test program revision, a major machine overhaul, or a material change, the old baseline no longer compares; flag it in the change log and restart the baseline from the change — or normal process drift gets reported as abnormal every single day.