Maps every discontinuation notice onto BOM lines and order lines, so procurement stops matching tables by hand
For manufacturing procurement: the people responsible for end-of-life material substitution, BOM maintenance, and order delivery. When an EOL/PCN notice arrives, the usual problem is that the notice sits in the inbox, the BOM in the system, and open orders in another sheet, with nothing tying the three together — only manual comparison is left. The source lists the industry as Manufacturing, the role as procurement, and the type as a live, industry-specific solution.
Consolidate the mapping among vendor models, vendor part numbers, and internal material codes into one table, noting who maintains it and how often it is reconciled. Without this table, models on a notice cannot land on BOM lines, and every downstream match leaks.
Before matching, confirm which elements the received EOL/PCN notice contains — typically the discontinued models, last-order date, last-ship date, and recommended replacements. Tag whatever is missing as missing; never fill it in by guessing.
Decide which field links notice, BOM line, and order line — usually the internal material code plus the BOM version. The wrong key halts every version of the same model at once, or misses an entire class.
The output is only two lists: affected BOM lines and affected order lines, each row showing its basis (which notice, which field matched). Assign one person each from procurement and planning to confirm row by row before acting.
Rows that cannot be matched or have no recommended replacement get parked separately with a named follow-up owner; never default them to switchable. Revisit the parked list regularly to tell whether data is missing or the notice simply didn't provide it.