Ask about missing items on the day customer material arrives, saving repeated chasing later
For production and CAM roles at manufacturing and industrial companies that receive customer material: incoming files are Gerber, drill, stack-up, impedance, and so on; missing files are the leading cause of CAM hold, and the gaps are often on the customer side. This pre-check calls out each required file item by item, so you can ask about any missing item the same day.
Fix a required-file list per project covering Gerber, drill, stack-up, impedance, and so on, stating the file-naming rule and version requirement for each; the list is frozen after joint confirmation by CAM and production, don't count items from memory each time.
List pre-check results item by item as 'present, absent, to be confirmed', not just a single line saying 'materials incomplete'; state clearly which item and which version is missing so it can be forwarded directly to the customer.
Agree that pre-check is completed and the missing-item list sent on the day material arrives, stating what's missing, who to ask, and when a reply is due; escalate only after the agreed time passes with no reply, and don't let it surface right before production scheduling.
Before rollout, confirm with the customer the naming, version, and submission method for each file type; otherwise a 'missing' item flagged by the pre-check may just be a difference in terminology; record the confirmation in the list's notes to reduce back-and-forth explanations.
Archive every pre-check result: who checked, which items were found, and when the customer filled the gaps. Over time you can see which type of missing item occurs most often and use that to adjust the list order and chasing priorities.