Helps bid sales teams write the technical proposal draft before the opening and check every scoring point in the tender
For sales and business staff responsible for bidding in construction, tourism, and agriculture, especially teams racing to finish proposals before the opening with nobody checking technical scoring points item by item. It first extracts the scoring points from the tender, then assembles the technical draft from them, solving the problem of finishing a draft without being able to say which paragraph answers which scoring point. The source lists it as an industry-specific, live solution with no measured data yet.
Extract the evaluation method and technical scoring table from the tender item by item into a list with point values and corresponding sections. If the method is in an annex or addendum, find it too; if no scoring table can be found, confirm the basis with the buyer or agent before proceeding.
Organize technical solutions, staff certificates, and past project cases from earlier bids into searchable files, each marked with its source and applicable scope. When generating the draft, take content only from this library; never write in qualifications or project experience that aren't there.
When generating, give each scoring point its own paragraph, with the opening line stating which requirement it answers. Put unmatched scoring points on a to-do list for a human to write, rather than letting them auto-fill with empty words.
Once the draft is ready, the bid lead checks off each item against the list, focusing on hard indicators like qualifications, project experience, and schedule commitments. Record every change — who made it and what — for review before the opening.
Require the draft by a fixed time before the opening, leaving room for human checks, sealing, and binding. Without this, the tool just pushes the crunch later, and the opening is just as frantic.