Put three quotes with different bases on one sheet, so procurement doesn't have to keep converting them
Applies to roles responsible for fabric and trim procurement in consumer and retail: used when a single purchase receives quotes from several suppliers with inconsistent pricing methods (some include freight, some convert at different wastage rates). It breaks the quotes down to a common set of comparable items and puts quality and delivery records alongside the price, avoiding orders placed on lowest price alone. The source lists the industry as consumer and retail and the applicable role as procurement.
Put each supplier's unit price, freight, wastage rate, minimum order quantity, and payment terms into one table, converting each item to a landed unit price; fill in whatever is missing and note the data source. Don't rank or compare until the conversion is done, so you don't compare a price including freight with one that doesn't.
The decision sheet keeps at least four items: landed unit price, lead time, quality-inspection results, and historical returns or recall records; if any one is missing, it doesn't enter the final comparison. The fields are jointly confirmed by procurement and quality and written into the template, with no ad-hoc additions or removals afterward.
For each supplier, fill in the delivery acceptance and after-sales handling situation over a past period, marking whether the source is sampling records or the supplier's own statement. If nothing can be found, write 'no record'; don't assume good performance by default.
If you end up choosing the lowest-priced supplier, state on the decision sheet the price difference and the conditions under which it's acceptable (for example, tighter sampling, phased delivery, or a small trial batch first); if you can't write a verifiable reason, escalate to a superior for review.
After the goods arrive, fill the actual acceptance and return/exchange situation back into the original decision sheet for the next comparison. Without this step, the sheet is a one-off form and the next supplier choice still relies on impression.