Help production find, one by one, the codes that should have been voided but are still linked after material balance is closed
For production staff in manufacturing, especially those handling material balance accounting, batch-code status maintenance, and scrap or void processing. It addresses the case where the books balance but the actual code status does not match the void records: material balance shows 100.00% closed, yet 3 codes that should be voided are still 'linked.' It suits teams that need to find such discrepancies one by one before reporting output or running a stock count.
Specify which void record and which code-link register to use, with at least the code, current status, status update time, and linked work order number; write down the cut-off time for both extracts, or the discrepancies will keep drifting.
Compare each code against the void record and its current link status instead of judging by totals. In the source case the total is 100.00% closed, yet 3 codes that should be voided are still 'linked' — something the summary figures cannot reveal.
For each mismatch state whether the void did not take effect, the status write-back was delayed, or the link was not released, and name who verifies it. Without classification, the same codes get manually rechecked again and again.
Make clear which roles can change code status, whether changes are logged, and whether a second person must review. Without this, both sides may edit at once after a discrepancy is found and the problem gets messier with each change.
Run the line-by-line reconciliation once at a fixed point before reporting output or before a stock count, produce a discrepancy table listing the codes and the outcome for each, and archive it so the next check can trace back. Set the frequency by workload; the source does not specify a cycle.