Spot the same issue repeating across multiple substation inspection rounds
For substation operations and maintenance crews and defect-management roles: each inspection record looks fine on its own, yet the same issue keeps recurring at the same bay and the same spot, and nobody puts the records together. The source marks the industry as Energy & Utilities and the role as production. The precondition is an electronic ledger of inspection records that can be pulled up by equipment and time; units still recording on paper with no unified numbering need to close that gap first.
Organize bays, equipment dual numbering, and temperature-measurement points into one cross-reference table, and fill in both paper records and the ledger system against it. Otherwise the same spot becomes two spots in two batches of records, and the comparison is unusable.
List records separately by time, equipment number, defect type, and location, and consolidate recent years of inspection and defect records into one table. Leave missing fields blank and flag them; do not substitute default values. This step usually takes real effort — size it up before you start.
Write down the matching rules: only records with the same equipment number, location, and defect type count as suspected repeats; for infrared temperature anomalies, phase and measurement point also matter. The rules must be specific enough to explain, for every match or non-match, exactly why.
The system outputs a list of 'suspected same-spot' items with links to the original records; the crew confirms on site before merging defect records. Do not let it auto-merge or auto-close anything — the confirmation stays with people.
Each month, sample the records judged as duplicates and check which merges were right and which were wrong, then feed the errors back into the rules. Also watch for newly commissioned or upgraded bays with no history to compare against.