Compares the work permit against the isolation list item by item before work starts, keeping production from starting with missing isolations
Built for production roles in energy and utilities, especially anyone opening confined-space work permits who must check the blind-flange isolation list. The problem it targets: every field on the permit is filled in, yet the isolation entries do not match the required list — and historically such permits still passed. The source's example: 11 blind flanges required, the permit listed only 3. It fits the pre-start verification step; it does not replace on-site confirmation.
Compile the required blind-flange list for every confined space into a baseline document stating location, ID, and current state — that is the verification benchmark. Without it, comparison has no reference and verification slips back to checking whether fields are filled.
Compare the blind-flange count and IDs on the permit against the baseline, entry by entry. Any single mismatch fails the permit and sends it back for completion — a fully filled form is never the pass criterion.
State it explicitly in the permit template or approval workflow: the verification verdict reads only the comparison differences, never the blank fields. Without changing that rule, the old "full form means pass" habit keeps waving incomplete permits through.
Keep a record of every comparison: how many flanges were required, how many were listed, where the differences sat, who reviewed, and when. The records serve later tracing and periodic reviews, and they decide whether the rules need adjusting.
Before going live, replay a batch of permits that passed historically and see how many incomplete ones the check catches. The replay results set the rules and the rejection workflow — this step cannot be skipped.