Solution #0618 · Finance · Industry-specific

Aggregating five sets of due diligence materials — a completeness dashboard showing what's missing and who to ask

Bring due diligence materials scattered across five places onto one screen, so you can see at a glance which one is missing and who to ask

Score
6.7
Internal scoring scale
Roles
Sales
Frontline role
Industry
Finance
Industry-specific
Maturity
Live
Validated in practice
01 — Business fit

Who should use it, and when

For sales positions in the finance industry who collect due diligence materials, and the compliance and risk colleagues who support them. It addresses not difficulty of judgment, but the time wasted asking around for materials scattered across five places. The premise is that these five sources are stable and can be connected for export; if materials are still in individuals' hands and passed around via WeChat, the dashboard can neither see nor manage them. The source lists it as industry-specific and Live, with no measured data.

02 — Key steps

The key moves that make it work

1
First identify the five sources of materials

List the five sources item by item: which system they come from, who maintains them, and how often they are updated. This step must come down to specific systems and specific people; mark any source whose responsible person can't be named as pending, and don't assume it will come in automatically.

2
Define the fields of the missing-items list

The point of what the dashboard shows is not 'whether there is material', but which one is missing, where it is stuck, and who to ask. Fields include at least material name, source, responsible person, and required arrival time; mark any missing one on the dashboard.

3
Trial run with one real project

Pick a due diligence project currently under way, check it against the dashboard, and compare the status shown on the dashboard with the materials actually received one by one. Any mismatch means either a source isn't connected or a field definition is ambiguous; fix it on the spot.

4
Write clear follow-up and handover rules

Make clear who checks the dashboard at what point, who follows up when an item is missing for how long, and how to escalate if there is no response. Write the rules as actions that can be followed, for example 'every Monday morning sales goes through the dashboard, and items missing for two days without a reply are passed to the team leader'.

5
Keep a description of the retrieval method

Write down how completeness on the dashboard is calculated: by number of materials, by required fields, or weighted by key items. If the method isn't written down, different people will draw different conclusions from the same number.

TAKEAWAY
Connect the sources first, then talk about completeness
The value of this solution is bringing 'what's missing and who to ask' out into the open, provided the five sources can be accessed reliably; if the sources aren't connected, the dashboard ends up being just a manually filled-in sheet.
03 — Risks & pitfalls

What to know before you start

Risk 1 · Data can't be retrieved from a source systemIf one of the five sources can only be exported manually or has no access permission, that column on the dashboard will stay blank or be filled by hand for a long time, and the completeness figure will instead give a false sense of security.
Risk 2 · Responsible person left blankThe panel works by identifying 'who to ask': if the person responsible for a certain type of material is listed only by department rather than as a named individual, the missing-item alert goes out with no one claiming it, and in practice you're back to asking people one by one.
Risk 3 · Delayed status backfillThe material arrives but no one updates the status, so the panel still shows it as missing and sales will chase the same item again; if a return isn't recorded, it may also be misjudged as complete. You need to specify who changes the status and within how long of receiving the material.