Solution #0079 · All industries · General

Check recovery of assets and authorizations on departure

Check and sign for computers and stamped authorization letters that are easy to miss at departure, item by item against a list

Score
6.7
Internal scoring scale
Roles
Admin
Frontline role
Industry
All industries
General
Maturity
Live
Validated in practice
01 — Business fit

Who should use it, and when

For companies with an exit handover process; the main executor is administrative staff, with support from IT, legal, or business owners. It addresses two kinds of leftovers: physical assets (computers, access cards, keys, equipment) and external authorizations (stamped letters of authorization, account permissions). The source lists the role as administrative and doesn't specify the industry; it is General and Live, but there are no measured results yet.

02 — Key steps

The key moves that make it work

1
List the two kinds of items separately

Make two tables: one records physical asset numbers and issue records, the other records the name, number, validity period, and holder of external authorization letters. Don't merge the two tables, or authorization items tend to be overshadowed by asset items. The source doesn't mention a template, so you need to build one based on your own company.

2
Attach it to the exit-process steps

Write the check into the exit procedure: administrative staff check the list before the last working day, and count and sign in person on the departure day. Who checks, who signs, and who to ask about missing items must all be written down, not left to verbal reminders.

3
Count in person and keep a sign-off sheet

Confirm physical items one by one against their numbers; the sign-off sheet must state the quantity, condition, and missing items; for items that can't be returned on the spot, write the return date and responsible person. Archive the sign-off sheet as a basis for later follow-up.

4
Handle authorization items through a separate revocation

For stamped authorization letters, first find the original or a copy to confirm the authorized party and validity period, then revoke or change it through internal approval and keep the submission record. Marking 'Recovered' on the company's own ledger doesn't count as finished.

5
Regularly spot-check completed exit records

Every so often, sample a few completed exit forms and check whether the sign-off sheets are complete and whether revocations have submission records. The sampling ratio and frequency are up to the company; the source mentions no specific standard.

TAKEAWAY
Count first, then sign; follow authorizations separately
The key to this solution isn't the tool but splitting assets and authorizations into two lists and checking and signing item by item at the exit step. If the list has missing items or nobody follows up on external revocations, hidden risks remain.
03 — Risks & pitfalls

What to know before you start

Risk 1 · The list is easy to leave items out ofIf you check only against the fixed-asset ledger, items that don't go into the asset system, such as stamped authorization letters and external accounts, will be missed. How complete the list itself is determines how much this solution can find.
Risk 2 · Depends on the departing person's cooperationCounting in person requires the departing person to be present. When they have already left, work remotely, or refuse to cooperate, the signing step falls through and only a one-sided record remains, weakening the basis for later accountability.
Risk 3 · External revocation lagsOnce an authorization letter is given to an external organization, revocation must be handled by that organization. The internal register may show it as recovered while externally it may still be valid; the source doesn't mention how to handle this gap, so agree on a follow-up person in advance.