01 — Background

What was the challenge

Challenge as recorded by the sourceElektroDistribucija Srbije (EDS), Serbia's distribution system operator serving 3.8 million customers, needed to modernize its legacy electricity grid to support renewable energy integration and improve reliability.
02 — How it works

What they actually did

1

Deployed EcoStruxure ADMS and DERMS to digitalize grid operations and integrate distributed energy resources

2

Grid losses reduced by 10-15%, and outage frequency cut by about 20%

3

Condition-based maintenance improved operational efficiency, serving 3.8 million users and enhancing supply reliability

Practice as recorded by the sourceEDS implemented EcoStruxure ADMS and EcoStruxure DERMS from Schneider Electric to digitize grid operations, with the partnership aimed at reducing network losses and increasing operational efficiency through network digitalization.
TAKEAWAY
What you can reuse
Not directly transferable for most SMEs; can serve only as a long-term infrastructure reference for energy-intensive enterprises.
03 — Risks & pitfalls

Know this before you try

Analyst judgment · risks and limitsGrid loss and outage reductions are range estimates and depend on overall grid modernization, not on a single software effect.
Evidence & sourcing reminderThis entry is third-party verified (evidence grade High, evidence score 92). All figures are quoted from third-party verification sources; trace them back to primary sources before citing externally. Rollout time and gains vary by company.
04 — Results & evidence

What the results were

Organization: ElektroDistribucija Srbije · Third-party verified

Reported resultsResults included a 10-15% reduction in network losses, a roughly 20% reduction in outages, improved integration of distributed renewable energy resources, condition-based maintenance improving operational efficiency, and increased grid reliability for 3.8 million customers.

Figures are third-party verified, not measured by this site.