Free data center operations teams from manually tuning chillers and water temperatures every day
A good fit for data center operations and facilities teams with years of sensor data and high electricity costs, especially sites with many chillers that rely on manual water-temperature settings. The source material lists the industry as IT & Internet, with roles in data center operations and facilities management. Without historical records of temperature, power, pump speed and setpoints, this approach cannot get started.
Train the model on years of historical sensor data from the data hall, taking temperature, power, pump speed and setpoints as inputs to predict future average PUE as well as temperature and pressure for the next hour. The prerequisite is that the historical data spans enough time to cover different seasons and loads.
Each recommendation the model produces is first run through a simulation to confirm temperature and pressure stay within the safety bounds set by operations, before it is handed to a person. The validation rules are defined by the operations team itself; the model cannot decide this on its own.
In the early stage after go-live, AI only issues action recommendations: how many chillers to turn on and what water temperature to set is confirmed by the on-duty engineer and executed manually. At the same time, record whether each recommendation was adopted and what the result was, and use those records to judge whether the recommendations can be trusted.
Only after recommendations have been steadily adopted for some time does the system enter trial operation, issuing control commands directly while keeping a manual override. Once no anomalies are confirmed, gradually widen the scope of autonomous control; the pace is decided by operations based on actual performance.
Energy-savings percentages must be compared against the pre-retrofit PUE and cooling-energy baseline. The figures in the source are vendor-reported numbers; measure a baseline in your own facility first, then assess what level is actually achievable — don't set targets upfront.
Case: Google DeepMind (2016) · vendor-reported
The figures are vendor-reported and come from the official blog; no measurement baseline or facility conditions are stated, so they cannot be taken directly as your own expectation.
Source: https://deepmind.google/blog/deepmind-ai-reduces-google-data-centre-cooling-bill-by-40