Helps product teams dredge a requirement pool that only takes in and never lets go — set keep-or-drop criteria before starting
Suited to product teams whose requirement pool only ever gains items and whose item count far exceeds what the team can process; the roles are product managers or requirement intake owners. The material cites one pool of 427 items where fewer than a third were touched in the past six months — the problem is that nobody decides keep-or-drop, not that nobody submits requirements. Industry is not specified; fit depends mainly on whether you have a fixed owner for requirement intake.
First write down which actions count as touching an item: priority changes, version links, and owner responses all count; typo fixes do not. Settle the standard before bucketing, or two people can get two different results from the same batch of requirements.
Sort items into four buckets — in progress, pending, closable, needs merging — with each bucket mapped to exactly one next action and one owner. Whatever cannot be classified on the spot goes to pending; do not close it just to be done with it.
For every requirement slated for closure, give the requester one written chance to confirm, stating the closing reason and how to reopen it later; if there is no reply within the time limit, proceed under the default rule, and file any reply with the record.
When duplicate requirements are merged, keep one master record and attach the original IDs of the merged entries under it, so that old IDs do not later become a dead end for context and requester.
New requirements must state the requester, the specific problem to solve, and what happens if nothing is done; incomplete submissions are not accepted. After that, re-run the same process on a fixed cycle, and name one product owner.