Solution #0130 · All industries · General

Requirement Source Traceability Archive

When the boss drills into a requirement's progress, you flip straight to the original record instead of digging through chat history

Score
8
Internal scoring scale
Roles
Product
Frontline role
Industry
All industries
General
Maturity
Live
Validated in practice
01 — Business fit

Who should use it, and when

The material lists the intended role as Product, with industry unspecified; it is a general-purpose tool. It suits product people who track several requirements at once and need to explain progress upward: when asked “what happened to this requirement afterward”, without an archive you dig through chat history for ages. It does not decide whether a requirement gets built; it only ensures that “where it came from, who raised it, and why it was decided that way at the time” can be looked up. Small teams with a single requirement source will see limited benefit.

02 — Key steps

The key moves that make it work

1
Decide which fields to record first

Before starting, settle the fields to record: requester, date raised, a link to the original words or screenshot, the reasoning at the time, and the related requirement IDs. Past ten fields, nobody is willing to fill them in — keep it to five to seven, run for a week or two, then decide whether to add more.

2
Create the record when the requirement arrives

Write the record at the moment the requirement is first raised or accepted, not after launch. Content backfilled from memory later will not hold up when questioned. Make record creation a precondition for scheduling: no record, no slot.

3
Keep an openable link to the original source

Writing “a leader said to do it” is useless; store the actual source — the specific passage of a chat screenshot, email, or meeting minutes, with the location noted. Screenshots must clearly show the time and the speaker, or nothing can be verified afterward.

4
When the judgment changes, start a new entry

When scope or priority changes, do not overwrite the old record; append a new entry: who changed it in what context, what it changed to, and why the original judgment no longer holds. Edit without logging, and later you cannot tell whether the original judgment was wrong or the plan simply changed.

5
Go through the archive on a regular schedule

Rather than waiting to be questioned, check the sources and current status of requirements in hand against the archive every week or two, and fill in missing entries along the way. Backfill everything at month-end, and many details are already forgotten.

TAKEAWAY
The value of the archive is being able to check on the spot
The point of this work is recording “who raised it, why it was done, and how it changed later” somewhere checkable, not producing a beautiful document. Few fields, created early, changes logged — do these three things and you will not have to dig through chat history when questioned.
03 — Risks & pitfalls

What to know before you start

Risk 1 · With no one filling it in, it becomes an empty shellThe archive is maintained by hand; once schedules tighten, filling in the archive is usually the first thing skipped. Over time only the earliest entries remain, which instead makes people think requirements have no source. Stop this with process (no record, no scheduling) — self-discipline alone will not hold.
Risk 2 · Backfilled content is not trustworthyThe “reasoning at the time” written afterward from memory is easily biased toward today's outcome, reading as if everything was thought through from the start. If such entries are treated as original evidence in retrospectives or blame review, they mislead judgment.
Risk 3 · Used to assign blame, it stops being accurateOnce the archive is used to pin responsibility on people, the people raising requirements start saying less and vaguer, and the original record distorts. State before launch: the archive is only for tracing sources and context, never for evaluating individuals.