Help product managers gather requirement sources and evidence in one go before the review meeting
Suitable for product roles that regularly attend requirement reviews, especially teams whose requirement sources are scattered across chat logs, emails, and tickets and have to be searched manually. The source does not specify an industry, so treat it as a general scenario. It addresses the problem of still confirming who raised a requirement an hour before the review and not having all the evidence, by gathering scattered sources and attachments in one place in advance.
Write what must be brought to the review as fixed fields: who raised the requirement, the original request record, supporting data, and scope of impact. Unless the list is fixed first, the tool doesn't know what to fetch, and what it assembles automatically is still a pile of loose parts.
Connect the few sources where requirements usually appear and check one by one whether read access is sufficient; mark sources that can't be connected clearly as 'manual supplement', otherwise the materials look complete while key items are actually missing.
Attach every piece of material to the same requirement ID to avoid mix-ups. Explain the numbering rule to colleagues who raise requirements in advance, otherwise the same matter gets logged as two entries and the materials split apart.
Materials that can't be found must be shown as to-be-supplied, not silently omitted. Before the meeting, assign each item on the to-be-supply list to a person, stating clearly who supplies it and when it will be back, so the review doesn't stall on the spot.
Set a point in time before the meeting when the material pack is generated (exactly how early varies by team; defer to official communication), and arrange for someone to go through it before taking it into the meeting. A generated result does not mean the content is valid; reading it once catches obvious errors and omissions.